The exact page text, read by your browser's voice.
1982–2026 · the verified county series; Town of Lakeville Comprehensive Plan (2011)
What the measures support, stated at their classes. At county scale, the verified series is the only acreage measure reached: 172,500 acres in farms (1982) → 154,142 (1997) → 149,981 (2017) → 153,034 (2022), farm numbers falling throughout, average size reaching 280 acres — consolidation with a late acreage uptick, not continuous conversion. Any township conversion claim must be proved from township-class carriers, and none with an acreage figure was reached. At the town's edge, the 2011 plan carries the corridor record (study frame: the town and its surrounding county area; its figures are town and corridor facts, not township acreage): shortly before the plan, "the northwestern Town limits have been expanded to include the Morningside Subdivision" — before that, few changes to the corporate boundary; existing town land use ran residential 51%, parks and open space 13%, the remaining 36% "affiliated with the commercial sector" — the plan carries no separate agriculture category for the town and its percentages are not a farmland measure. The interchange ground — forthcoming U.S. 31 at S.R. 4 — sat "generally surrounded by farmland" of limited relief except around Hoffman-Shidler Ditch, farmland "generally well drained level ground that is well suited for large footprint commercial and industrial uses," much of it zoned agricultural; the plan recommended rezoning the corridor "in a manner that is proportional to likely demand," a TIF district along Pierce Road, and sewer and water extensions to "green field sites" — and, in the same document, the counterweight: enforce "the current twenty acre rule surrounding Lakeville," direct intensive development to ground contiguous to the town boundary, and preserve farmland among its Smart Growth tenets. Its traffic premise (S.R. 4 then about 2,500 vehicles a day; U.S. 31 expected over 20,000) judged the Lakeville interchange "in a less competitive position" than S.R. 6 and Kern Road, which already had significant commercial development — development at Lakeville would "likely be limited." After the bypass (opened 27 August 2014, east of town; LK-1), the pressure point moved from the old in-town alignment to that interchange ground. No post-2014 carrier reached measures how much Union Township farmland has since converted, what acreage remains in farms in the township, or what township farms grow today — the Census of Agriculture publishes county data only, and no 2022 township-class agricultural carrier was found. The gap stands named (settlers: the 2011 plan's land-use maps read as maps; county parcel/GIS data; the township assessor; the USDA Cropland Data Layer). (One source-use warning rides with the plan wherever it is cited in this build: its history sketch dates "the Vandalia Railroad" to 1845, against LK-1's settled chronology — the South Bend Branch of 1883. The plan is used in this build only for its 2011 land-use and planning statements, never for railroad chronology.)