The exact page text, read by your browser's voice.
item 10 — the mechanism article: railbanking and the Indiana trails programs, applied to this ground
A rail-trail is a legal act before it is a path: when a railroad moves to abandon a corridor, the corridor's easements would ordinarily dissolve back into the adjoining landowners' parcels, and the line would be lost as a line forever. Congress answered that in 1983, amending the National Trails System Act to create railbanking — interim trail use: the railroad files for abandonment with the federal Surface Transportation Board; a trail sponsor files in the window the proceeding opens; and the corridor is held whole, in public hands, as a trail — banking the right-of-way against a possible future return to rail service, a return the published record notes has almost never happened. The money runs on two rails of its own. Federally, the Recreational Trails Program returns a share of the federal motor-fuel tax paid by off-highway recreational vehicles to the states for trail building. Indiana codified its own program at Indiana Code 8-4.5-5 (added by P.L. 40-1995): the Recreational Trails Program, administered by the Department of Natural Resources, funding acquisition, construction and improvement of public trails, with abandoned railroad corridors named in the statute itself as an eligible route class, and a contribution of at least 20 percent matching funds required. In 2021 Indiana replaced the federal program with the Indiana Trails Program — the same role, in the DNR's own account, but state dollars passed from INDOT to the DNR through the Federal Fund Exchange (Indiana Code 36-9-42.2), earmarking 30 percent of funds for motorized and 30 percent for non-motorized projects; the state's Next Level Trails grants, announced with the 2018 Next Level Connections program, later added the largest state trail funding in Indiana's history on top. Applied to this ground, the mechanism's honest print is its non-applicationThe county's trails here are park trails that a railroad's history overlooks, not railroad trails; the mechanism article prints whole because the leg requires it, and its local chapter is the absence it explains.
Sources:
- Hoosier Rails to Trails Council (indianatrails.net), Policies — the Surface Transportation Board's abandonment proceeding and the railbanking / interim-trail-use filing steps; the 1983 congressional creation of interim trail use.
- Indiana Trails (indianatrails.com), Rail Trail — rail trails as converted rights-of-way held under federal railbanking legislation, with reversion to rail use possible and rare.
- Indiana Code 8-4.5-5, Recreational Trails Program (P.L. 40-1995) — DNR administration; grant eligibility; abandoned railroad corridors as an eligible route class; the 20-percent match.
- Indiana DNR, Indiana Trails Program FAQs and Program Manual 2023–2024 — the Indiana Trails Program replacing the Recreational Trails Program in 2021; state funds via INDOT's Federal Fund Exchange (IC 36-9-42.2); the fuel-tax origin of the funds; the 30/30 motorized / non-motorized earmark.