MoosedHistory
Menu
Main Roads & Corridors

Main Roads & Corridors

Plank, then gravel: the road's second surface

The exact page text, read by your browser's voice.

1850s · THE PLANK-ROAD PASSAGE, AT ITS DOCUMENTED SIZE

The plank-road era touched the bend briefly, and Howard dismissed it in a sentence: Indiana's plank-road boom of the late 1840s and 1850s — toll roads surfaced with timber planks, chartered by the score across the state — reached St. Joseph County only lightly, and the county's own historian is the measure of how lightly: "Plank roads were for a time resorted to on some lines, as on the Michigan road between South Bend and Plymouth; but these were all wisely abandoned and gravel roads substituted." That is the whole of the documented plank record for this city in the sources reached: one line, the Michigan Road's first stretch south toward Plymouth, planked for a time and then graveled like the rest. What followed the gravel era on the same line was the state highway system itself: the road south from South Bend was State Road 1 and the road west State Road 25 in the first designations, and their renumberings are told in the entries on US 31 and US 20 below.

Sources:

  1. Timothy Edward Howard, History of St. Joseph County, Indiana (1907), roads chapter — the plank road on the Michigan Road between South Bend and Plymouth, and the substitution of gravel, quoted whole.

Cite this page

Using this page? Copy a credit line. Last updated November 12, 2026.

Source: Plank, then gravel: the road's second surface, Moosed History by Project Moosed, https://history.projectmoosed.com/usa/midwest/indiana/south-bend/corridors/plank-then-gravel-the-road-s-second-surface/