MoosedHistory
Menu
Bike Trails

Bike Trails

The systems around it: connectors and outlying trails, area by area

The exact page text, read by your browser's voice.

Granger Paths does not connect to the region's river system, and the honest map is a set of named neighbours with a gap between. West — the county system: St. Joseph County Parks' LaSalle Trail, built 2001 on the old Indiana Railway / Southern Michigan Railway interurban bed, runs 3.5 paved miles from Roseland to the Michigan state line, and is the Indiana leg of the Indiana–Michigan River Valley Trail — described as 17 paved miles between Mishawaka and Niles in current trail literature and as a 34-mile Mishawaka-to-Niles system by one of its engineering firms; both figures stand unreconciled. South of Roseland the same corridor continues as South Bend's riverside trails into the Mishawaka Riverwalk, the riverfront loop through Mishawaka's river parks. East — Elkhart County: the Crossway Trails network (the Pumpkinvine corridor and its connectors) lies a county away, and MACOG's Mishawaka-to-Elkhart Trail planning project — an $816,000 RAISE-funded study, with a $186,800 federal planning award reported — exists precisely to bridge the 11-mile gap between the Mishawaka Riverwalk and the Elkhart Riverwalk, which would make a roughly 58-mile continuous route. The gap, stated plainly: between the east end of that river system and Granger Paths' five miles there is no trail, no signed on-road connector in the MACOG or TrailLink record, and no funded project as of November 2026; a rider goes from the Riverwalk to Adams Road on ordinary arterial roads, across the county's busiest commercial ground. TrailLink's county listings give Granger exactly one trail — Granger Paths itself, 5 miles, concrete, Adams Road to Gumwood Road, vision 21 miles. Mountain bikes, tested: there is no mountain-bike trail in or adjoining the CDP. The county's singletrack is at Bendix Woods County Park (a c.6-mile one-way loop, completed 2013, managed with the Northern Indiana Mountain Bike Association — NIMBA) and at Potato Creek State Park (7.4 miles per the DNR property page; a park brochure figure of 7.5 also circulates). Granger's own dirt riding is the unpaved shoulder and the golf-cart path that closes the last 0.3 mile to Gumwood — which is to say, none.

Sources: TrailLink, Granger Paths and Granger city listings (5 mi; vision 21 mi; 0.3-mi golf-cart-path link); St. Joseph County Parks master plan, LaSalle Trail corridor (3.5 mi; interurban bed; state-line terminus); LaSalle Trail record (built 2001; River Valley Trail component); Greenways Foundation / MACOG, Mishawaka-to-Elkhart Trail RAISE planning award (11-mile gap; c.58-mile completed route); Southwest Michigan Planning Commission, Indiana–Michigan River Valley Trail (Niles phases, 2014–2019); NIMBA and St. Joseph County Parks, Bendix Woods MTB (c.6 mi, completed 2013); Indiana DNR, Potato Creek State Park (MTB 7.4 mi).

Cite this page

Using this page? Copy a credit line. Last updated November 12, 2026.

Source: The systems around it: connectors and outlying trails, area by area, Moosed History by Project Moosed, https://history.projectmoosed.com/usa/midwest/indiana/granger/bike-trails/systems-around-it-connectors-and-outlying-trails-area-by/