The exact page text, read by your browser's voice.
1990–2026
The checklist closes the leg with the modern layer, and New Carlisle's was built, characteristically, just at the town's edge — close enough to tax and employ it, far enough to leave the district's skyline to 1949. Its first monuments are the steel plants of the town's industrial park country: I/N Tek, completed in 1990, and I/N Kote, completed in 1991, the joint-venture coating lines whose arrival the district-era record already noted as the town's modern industrial note, and whose corporate course stands in the businesses and spine legs. Their architecture is the architecture of the process shed — vast, low, windowless, drawn at the scale of the coil line rather than the street — and it prints here at that description, the record read carrying no architect, no elevation and no apology for either plant. What is arriving now will redraw the layer entirely, and it stands in the Story of New Carlisle section at full announcement strength, pointed to here at this section's close: the Indiana Enterprise Center country east of town, with Amazon Web Services' data-center campus announced in April 2024 and growing through 2026 toward some thirty buildings, the General Motors–Samsung SDI battery plant's 680 acres under its paused and re-owned construction, and the Honeysuckle Solar field in service since 2024 — the largest building campaign in the township's history since the Michigan Road, being raised, as the road was, by outside capital on farm ground, for traffic that does not stop in town. The built record of 2026 thus closes as it opened in 1835: a small, well-filed historic core, intact and listed, with the age's real construction happening at its rim — and this section, like the town, keeps its eyes on both.
Sources
- Nomination-era district record and this build's Businesses — I/N Tek (1990) and I/N Kote (1991).
- This build's The Story of New Carlisle — the Indiana Enterprise Center, the AWS campus, the battery plant and Honeysuckle Solar, at announcement and report strength, 2024–2026.